The operating system for crane companies.
RUN EVERY CRANE, EVERY TICKET, EVERY DOLLAR.
FROM ONE PLACE.
Crane companies running real fleets across multiple dispatchers and yards lose six and seven figures a year in work they already did. The double-time tail shaved off every ticket. Standby that never got billed. Liens never filed. CraneOp finds it, then captures it.
THE COMPANY RUNS. YOU GET YOUR LIFE BACK.
THE COMPANY IS RUNNING.
YOU'RE THE BOTTLENECK.
Three cranes went out this morning. Six foremen want updates. A GC wants a quote by lunch. The accountant needs Monday's ticket. Your annual inspection is in 9 days and the binder's in the truck. None of that needs you. All of it has you.
Show Me What This Costs MeConstruction subs wait 83 days to get paid. Your money sits in their bank. Get the invoice out the minute the ticket signs.
What the average small business loses per year in unanswered calls, factoring lifetime customer value. The receptionist that doesn't sleep answers every one of them.
OSHA walks in Monday. The certs are sorted, dated, and ready Sunday.
Sources: construction industry DSO via Construction Financial Management Association (cfma.org). Missed-call revenue loss per industry estimates via Dialzara and DocJoist.
◆ The Manifesto
YOU DIDN'T BUY A CRANE
TO BABYSIT SPREADSHEETS.
You bought it to lift things nobody else can. Not to chase POs at midnight. Not to rebuild the schedule because Excel crashed. CraneOp runs the back office while you run the cranes.
THE BID YOU SENT TUESDAY.
PAID BY FRIDAY.
Quote → ticket → invoice → payment. One unbroken line. No more 90-day collections. No more rebillable hours bleeding out the back door. The money you earned, in the bank, before the next job rolls.
OSHA WALKS IN.
YOU DON'T FLINCH.
Every cert, every lift plan, every inspection, already filed, already current, already in their hand before they ask. Compliance stops being a fire drill and starts being a moat.
One Login. The Whole Company.
THIS IS MONDAY MORNING NOW.
Active jobs. Revenue booked today. Which cranes are earning and which are sitting. The jobs the Receptionist booked while you were having coffee. Where compliance stands. Where the month is tracking. One screen, before the first cup. You're seeing the company. The company isn't waiting on you.
Walk My Yard
| Job | Client | Status |
|---|---|---|
| J-0421 | Regional GC | ● On Site |
| J-0420 | Industrial Contractor | ● En Route |
| J-0419 | Electrical Contractor | ● On Site |
| J-0418 | Steel Erector | ● On Site |
| J-0417 | Mechanical Contractor | ● Completed |
Every job. Every crane. Every crew. On one board. Foremen see ETAs. GCs see status. You don't see your phone.
Field signature locks the bill. Bill hits the GC before the carrier hits the gate. Your 83-day wait starts the day of the lift, not the week after.
Operator cards. Annual inspections. Pre-shifts. Lift plans. Wire rope logs. Where the inspector wants them before he asks.
Hours billed vs hours sitting. Maintenance due vs maintenance done. Margin per unit per month. The 90-ton either earns or it goes.
Cards current. Hours logged. Job assigned. Pre-shift done. Before the gate opens.
Indexed, dated, locked. The day the lawyer calls, you sleep through it.
◆ Chapter Final
THE COMPANY RUNS.
YOU GET YOUR LIFE BACK.
You started this to run a crane company, not a billing department. You wanted equipment that earns while you sleep, not a phone that won't stop. Let CraneOp run the office. You run the cranes.